In September of 2011, Southeast Pavement Services was awarded a contract in Florence, S.C., as a subcontractor for Palmetto Corp, Conway, S.C. The project was completed in November of 2011 and consisted of paving 1000 foot sections of concrete of Highway 52 in three locations (at signaled intersections of I-95 and Cashua Street). We milled out 8” or 10” thick areas of asphalt and replaced it with high early strength concrete. This type of concrete is designed to carry a heavier traffic load for longer periods of time without maintenance. The lanes were closed in the evenings and were reopened each morning so as not to impede the flow of heavy rush hour traffic and the SPS crews worked diligently each night to achieve this job.